Union Global has been awarded the supply and installation works for the rerouting, re-installation and pressure testing of a 250mm HDPE Pipeline produced by Hydro Dynamic Pipe Engineering. The project also includes the installation of an SS pipeline to connect the polyethylene pipeline to the main firefighting tanks. The project works are located in the solar park in Al Qudra and our team of skilled and experienced welders and fabricators are on hand to complete the project.