HomeInstallation ProjectsSupply, butt fusion welding, installation and pressure testing of water transmission line
Union Global has successfully completed the supply, welding, installation and pressure testing of 500mm and 15mm water transmission line in Dibba. The works were to extend an existing line by 300m and included the supply of all necessary fittings.